The Subway line from Petach Tikva through Tel Aviv to Bat-Yam – the Red Line.
Initiator: NTA Metropolitan Mass Transit System.
Work commissioned: I.B.I.B. Israel Advisors Group Ltd.
Project cost: 5 billion NIS
Project Description: Construction of 10 underground stations from 33 stations in Tel Aviv, Bnei Brak and Ramat Gan.
Our services:
Utilities coordination of 10 underground stations. The work includes an in-depth understanding of the station’s constructive plans, groundwater degradation problems, engineering the execution of the stations, and providing creative solutions for copying the infrastructure (water, sewage, drainage, upper voltage, high voltage, etc.) from the execution areas while implementing complex traffic arrangements in traffic-saturated areas.
Status: On-going.