Light Rail – Neve Yaakov Extension

Initiator: Moriah Jerusalem Development Company Ltd.
Work commissioned: Moriah Jerusalem Development Company Ltd.
Project cost: 87 million NIS
Project Description: Construction of the light rail in Jerusalem Neve Yaakov extension in an area of 2 km railway that includes infrastructure, retaining walls and roads.

Our services:

  • Designing management, includes active and professional navigation of the complex project designing.
  • management & supervision for the construction phase of the project.
  • Management of the utilities coordination and coordination with all the relevant infrastructure owners

.Status: Completed

Previous
Next

The Subway line from Petach Tikva through Tel Aviv to Bat-Yam – the Red Line.

Initiator: NTA Metropolitan Mass Transit System.
Work commissioned: I.B.I.B. Israel Advisors Group Ltd.
Project cost: 5 billion NIS
Project Description: Construction of 10 underground stations from 33 stations in Tel Aviv, Bnei Brak and Ramat Gan.

Our services:

Utilities coordination of 10 underground stations. The work includes an in-depth understanding of the station’s constructive plans, groundwater degradation problems, engineering the execution of the stations, and providing creative solutions for copying the infrastructure (water, sewage, drainage, upper voltage, high voltage, etc.) from the execution areas while implementing complex traffic arrangements in traffic-saturated areas.

Status: On-going.

Light Rail – Mount Scopus.

Initiator: Moriah Jerusalem Development Company Ltd.
Work commissioned: Moriah Jerusalem Development Company Ltd.
Project cost: 120 million NIS
Project Description: Preliminary stage construction of the Light Rail on Mount Scopus, an extension to the Hebrew University. A 2 km project that includes the infrastructure relocation, construction of retaining walls, development of roads and sidewalks.

Our services:

  • Designing management.
  • Management & supervision for the construction phase of the project.

Status: On-going.

Light Rail – Mount Scopus Tunnel

Initiator: Moriah Jerusalem Development Company Ltd.
Work commissioned: Moriah Jerusalem Development Company Ltd.
Project cost: 37 million NIS
Project Description: Extension of the light rail line in the Mount Scopus area in Jerusalem, the project includes: a 500 m long tunnel, relocation and construction of infrastructure, construction of retaining walls and paving of a road.

Our services:

  • Design management.
  • Management & supervision for the construction phase of the project.

Status: On-going.

Pinchas Rosen Bridge

Initiator: NTA Metropolitan Mass Transit System.
Work commissioned: CRTG – China Railway Tunnel Group Co.
Project cost: 7 million NIS
Project Description: Tender using the DB method as part of the Green Line project, a section of track at the intersection of Pinchas Rosen, Raoul Wallenberg and Sheetrit streets, also called section G4-8. The section of the track is a bridge over the Pinchas Rosen junction, with the bridge mostly consisting of 4 prefabricated beams that support 2 light rail tracks. As part of the project, landscape development and restoration work is being carried out in Ganei Yehoshua Park near the Yarkon River and the copy of infrastructure for Mei Avivim, Bezeq, cellular communications and electricity.

Our services:

  • Design management.
  • Utilities coordination.

Status: On-going.

Previous
Next

The “Emek” Railway (Haifa-Beit Shean)

Initiator: Israel Railways
Work commissioned: O. Sali Engineering Ltd.
Project cost: 40 million NIS
Project Description: Evacuation of infrastructure for the Valley Railway route.

Our services:

  • Management and supervision of the construction phase of the relocation of infrastructure, which includes water, sewage lines and high voltage power lines of the IEC.
  • Utilities coordination and obtaining approvals.

Status: Completed.

Separation of levels

Initiator: Israel Railways
Work commissioned: Israel Railways
Project cost: 28 million NIS
Project Description: Separation of levels by train

Our services:

  • Utilities coordination of all infrastructure elements; Israel Railways, IEC, Mekorot, Petroleum & Energy Infrastructures, EUROPE ASIA PIPELINE CO, Bezeq, Cellcom and Hot.
  • Building an estimate for the evaluation of agricultural infrastructure for compensation to local communities.

Status: Completed

Rehovot Line – Bnei darom

Initiator: Israel Railways
Work commissioned: Israel Railways
Project cost: 28 million NIS
Project Description: evacuation of national infrastructure from the route of doubling the railway.

Our services:

  • Designing management of water systems, sewage suction, Bezeq lines, fuel lines and more.
  • Utilities coordination with all infrastructure companies, including managing the detection of all underground infrastructures.
  • Issuing permits and permits for an execution plan for infrastructure and railway work.
  • Helps with permissions to milestones.
  • Testing and diagnosing problems and providing solutions for the efficient and rapid promotion of the route.

Status: Completed

Train line to Eilat

Initiator: Israel Railways
Work commissioned: Israel Railways
Project cost: 350 million NIS
Project Description: Copying the infrastructure from the railway route to Eilat.

Our services:

  • Managing and Utilities coordination and clearing the new railway route corridor to Eilat.
  • Providing various engineering solutions for the railway crossing.
  • Issuing permits and permits for an execution plan to copy the infrastructure.

Status: on hold