Western Gathering Sewer Line in Netanya

Initiator: Mei Netanya Corporation
Work commissioned: Mei Netanya Corporation
Project cost: 2 million NIS
Project Description: Performing a new 900 mm sewage line and performing a 1,600 mm compression under a gas station

Our services:

  • Management & supervision for the construction phase of the project.
  • Performing pollution tests for fuel at an active station, soil testing and preparing reports for the evacuation of contaminated soils

Status: Completed.

Upgrading Rishon-lezion Street in Netanya

Initiator: Mei Netanya Corporation
Work commissioned: Mei Netanya Corporation
Project cost: 3 million NIS
Project description: Performing sewage work, drainage and road construction. Works that include placing a new sewage line with a diameter of 200 mm + laying drainage pipes with a diameter of 600 mm.

Our services:

  • Management & supervision for the construction phase of the project.

Status: Completed.

Laying a sewer line on orazim Street in Netanya

Initiator: Mei Netanya Corporation
Work commissioned: Mei Netanya Corporation
Project cost: 3 million NIS
Project description: Placing a 1,000 mm HDPE sewer line for a sewage drain line. Laying concrete pipes with polyethylene internal sleeve with a diameter of 1,000 mm.

Our services:

  • Management & supervision for the construction phase of the project.

Status: Completed.

Juliana Street in Hadera

Initiator: Hadera Municipality
Work commissioned: Hadera Municipality
Project cost: 7 million NIS
Project Description: Managing the designing of the continuation of Juliana Street in Hadera.

Our services:

  • Designing Management

Status: Completed.

IPM- Planned Power Plant In Beer Tuvia – Evacuation and relocation of infrastructure from the power plant’s surface

Initiator: IPM Beer Tuvia
Work commissioned: IPM Beer Tuvia
Project cost: 2.8 million NIS
Project Description: evacuation and relocation of infrastructure from the power plant area. Works including copying the drain line with a Diameter of 315 millimeters for 550 meters. Performing water line 8″ along 210 m for water ovation at the planned station + gravitational sewage line with a diameter of 200 mm along 90 meters. Copying a high voltage line and copying Cellcom and Hot lines of communication.

Our services:

  • Management & supervision for the construction phase of the project.

Status: Completed.