Widening of Road 2 in the Havatzelet-Olga section.

Initiator: Netivei Israel – Multimodal Transport infrastructure company.
Work commissioned: Ramet Ltd.
Project cost: 450 million NIS

Project Description: Widening of Road 2 in the Havatzelet-Olga section, which includes the construction of bridges, interchanges, the walls of the anchorages for staying in the water, water transfers and livestock, and the regulation of a stream.

Our services:

  • Designing management on behalf of the contractor.

Status: On-going.

Connecting Route 16 to Farbstein Street and Israel Highways

Initiator: Moriah Jerusalem Development Company Ltd.
Work commissioned: Moriah Jerusalem Development Company Ltd.
Project cost: 44 million NIS

Project Description: Construction of a road connecting Route 16 and Farbstein Street and israel’s roads.

Our services:

  • Designing management.
  • Management & supervision for the construction phase of the project.

Status: On-going.

Previous
Next

Haifa Road – Feeding Road for the Krayot Bypass

Initiator: Yefenof Transportation Infrastructure and Construction Ltd.
Work commissioned: Yefenof Transportation Infrastructure and Construction Ltd.
Project cost: 50 million NIS
Project Description: Building a feeding road for the Krayot bypass

Our services:

  • Utilities coordination of an infrastructure-saturated road.

Status: Completed.

Public Transport Carmel Ridge

Initiator: Yefenof Transportation Infrastructure and Construction Ltd.
Work commissioned: Yefenof Transportation Infrastructure and Construction Ltd.
Project cost: 100 million NIS
Project Description: Construction of a matron with a total length of 9 km in the Carmel Ridge between the University and the Carmel Center, a project that includes tunnels with a total length of about 3 km, bridges and underground parking lots.

Our services:

  • Designing management of the relocation of the infrastructure in the project.
  • Utilities coordination for the project.
  • Supervision and management of locating, discovering and mapping underground infrastructures.

Status: Completed.

Haifa – Kabir neighborhood

Initiator: Yefenof Transportation Infrastructure and Construction Ltd.
Work commissioned: Yefenof Transportation Infrastructure and Construction Ltd.
Project cost: 100 million NIS
Project Description: Construction of a road connecting Shlomo Hamelech Street in Haifa to the Neighborhood of Dvir.

Our services:

  • Utilities coordination.
  • Utilities consulting.

Status: Completed

Highway 431 (Israel)

Initiator: Netivei Israel – Multimodal Transport Infrastructure Company Ltd.
Work commissioned: Hayovel lines Ltd.
Project cost: 40 million NIS
Project Description: construction and relocation of water lines (diameters of 40″,48″,60″) sewer systems, Effluent along 20 km of the section of road.

Our services:

  • Management & supervision for the construction phase of the project & for the relocation of the infrastructures

Status: Completed

Highway 531 – South Section Route 20

Initiator: Netivei Israel – Multimodal Transport Infrastructure Company Ltd.
Work commissioned: Ashtrom – Vered
Project cost: 40 million NIS
Project Description: Relocate Mekorot water lines in diameters of 30″ to 80″, gravitational sewage lines, sewage and clinching lines, main Bezeq lines and other communication lines, water lines for irrigation and all types of additional systems

Our services:

  • Designing management.

Status: Completed.

Highway 6 – yoqneam to Somekh Junction

Initiator: Trans Israel National transportation Ventures
Work commissioned: Shapir Engineering & manufacturing
Project cost: NIS 10 million
Project Description: Evacuation and relocation of the infrastructure system from the area of Route 6 in the section between yoqneam to Somekh Junction

Our services:

  • Designing management.
  • Utilities coordination
  • Supervision for the work of relocate and evacuate infrastructure

Status: Completed.

Matron Nesher

Initiator: Yefenof Transportation Infrastructure and Construction Ltd.
Work commissioned: Yefenof Transportation Infrastructure and Construction Ltd.
Project cost: 450 million NIS
Project Description: Construction of a public transportation route in favor of a matron along the route between the Paz Bridge on Bar Yehuda Road and the end of the municipal border of Nesher, the Cantarian Club area.

Our services:

  • Utilities coordination.

Status: Completed.