Western Gathering Sewer Line in Netanya
Initiator: Mei Netanya Corporation
Work commissioned: Mei Netanya Corporation
Project cost: 2 million NIS
Project Description: Performing a new 900 mm sewage line and performing a 1,600 mm compression under a gas station
Our services:
- Management & supervision for the construction phase of the project.
- Performing pollution tests for fuel at an active station, soil testing and preparing reports for the evacuation of contaminated soils
Status: Completed.




Upgrading Rishon-lezion Street in Netanya
Initiator: Mei Netanya Corporation
Work commissioned: Mei Netanya Corporation
Project cost: 3 million NIS
Project description: Performing sewage work, drainage and road construction. Works that include placing a new sewage line with a diameter of 200 mm + laying drainage pipes with a diameter of 600 mm.
Our services:
- Management & supervision for the construction phase of the project.
Status: Completed.




Laying a sewer line on orazim Street in Netanya
Initiator: Mei Netanya Corporation
Work commissioned: Mei Netanya Corporation
Project cost: 3 million NIS
Project description: Placing a 1,000 mm HDPE sewer line for a sewage drain line. Laying concrete pipes with polyethylene internal sleeve with a diameter of 1,000 mm.
Our services:
- Management & supervision for the construction phase of the project.
Status: Completed.




Juliana Street in Hadera
Initiator: Hadera Municipality
Work commissioned: Hadera Municipality
Project cost: 7 million NIS
Project Description: Managing the designing of the continuation of Juliana Street in Hadera.
Our services:
- Designing Management
Status: Completed.

IPM- Planned Power Plant In Beer Tuvia – Evacuation and relocation of infrastructure from the power plant’s surface
Initiator: IPM Beer Tuvia
Work commissioned: IPM Beer Tuvia
Project cost: 2.8 million NIS
Project Description: evacuation and relocation of infrastructure from the power plant area. Works including copying the drain line with a Diameter of 315 millimeters for 550 meters. Performing water line 8″ along 210 m for water ovation at the planned station + gravitational sewage line with a diameter of 200 mm along 90 meters. Copying a high voltage line and copying Cellcom and Hot lines of communication.
Our services:
- Management & supervision for the construction phase of the project.
Status: Completed.